Gladstone Station
Gladstone, New Jersey


Scope of Work:
  • Twenty four inch diameter caissons
  • New high level platform and railings
  • Sidewalks and ramps

Owner Contact:
New Jersey Transit - Jim Savarese

Engineer(s): c/o NJ Transit

Architect(s):

Job Description:

Integrated's contract included the preparation and construction of a new high level platform at the Gladstone Station. As part of the work, Integrated located and had a subcontractor drill 20 caissons for the installation of the foundations. A steel sub-frame with concrete planking and poured in place concrete topping completed the platform construction. Additional work items included block work and the installation of railings.